top of page

The Millhouse Berkhamsted

Arch support under a bridge
KTA Service
Structural Survey & Design

Location
Berkhamsted
Client 
Greene King

Contractor

 

Over time, supporting structures can deteriorate, especially in cases where water has eroded the materials.

This was the issue with a brick arch supporting the boundary wall over the millstream, as well as the lower millstream brick arch bridge, both of which had partially collapsed. 


After visiting the site and measuring both structures, we determined that the defects were due to deteriorated embedded timber wall plates in the upper wall and washed-out mortar on the soffit of the arch bridge.

Working closely with the listed building officer, we created structural condition drawings and outlined repairs and strengthening solutions that preserved the historic materials and character of the site.

 

Temporary Works

KTA Structures logo

01689 875980

© 2025 KTA Structures. All Rights Reserved.

The Institute of Structural Engineers Logo
The Engineering Council Logo
Institute of Civil Engineering Logo
bottom of page